top of page
F/V Timmy Boy


Before
After
YBE designed and fabricated the following new items for the F/V Timmy Boy:
Raised entire deck 30-Inches with new bulwarks.
Gutted engine room and installed all new auxiliary engines and replaced all piping systems, as well as all new hydraulics.
Aluminum Pilot House
Aluminum Freestanding Mast With Catwalk
Raised Fo'c'sle
YBE Crab Block
YBE Articulated Crab Davit
YBE Barracuda Bait Chopper
bottom of page